It’s always a pleasure to work in Chardon, helping families repair plumbing fixtures or install new ones, take on larger projects such as sewer line repairs, and maintain HVAC systems so they’re running as efficiently as possible.
Community Involvement
- We are proud to be members of the well-established Chardon Chamber of Commerce, and contribute to the support of new business development throughout the community.
- Participating in local Chardon events like the annual Geauga County Maple Festival is a highlight of our year! Look for us during the next parade!
What Our Customers Are Saying
Jim B. in Chardon, OH
Project: Repaired and replaced plumbing and fixtures
“He called before coming, showed up on time and promptly took care of the problem. I cant ask any more than that. Price was reasonable also.”
Leadele R. in Chardon, OH
Project: Repaired a water treatment and purification system
“Diagnosed problem, explained the functioning of my water softener, it’s anticipated life, etc. and fixed the problem instead of trying to sell me a new one prematurely. I respect and appreciate that. He advised me also about future maintenance. I will recommend them and use them again when needed.”
Frequently Asked Questions from Chardon Customers
Q: Is there anything I need to do to get my pipes ready for another Ohio winter? I’ve heard of people’s pipes freezing and bursting, and I’d rather not have a similar mess on my hands.
We’ve prepared this quick checklist to help prepare your home’s plumbing system for winter weather. If you have more specific questions about how to properly insulate pipes, we’d be happy to take your call.
Q: How do I know when my water heater needs to be replaced?
Hot water heaters that have been properly maintained typically last between 8 and 12 years. Check out this article which answers your question more in-depth.
Q: How do I tell if my water is unhealthy? Should I install a water filtration system?
Water filtration systems can do much more than provide clean drinking water. After reading this list of benefits, give us a call to discuss your water needs more thoroughly.
Recent Jobs and Reviews in Chardon, OH
Job Locations and Reviews
Responded to callback for thermostat installed in November with reported cooling malfunction while heating operated normally. Inspected thermostat wiring at air handler terminal strip and verified all connections were secure and properly terminated to correct terminals. Tested system operation in cooling mode and confirmed air conditioning unit engaged properly with no wiring issues found.
Conducted site assessment for Arzel zoning system installation. Evaluated existing HVAC equipment in mechanical room, including furnace/air handler unit and associated ductwork configuration. Documented current smart thermostat setup and reviewed system layout to determine optimal zoning integration points for enhanced climate control and indoor air quality management.
# Exhaust Repair Completion Returned to property to address exhaust system issue. Completed necessary repairs to the HVAC exhaust termination system over a 2-hour service period. System tested and verified to be functioning properly upon completion of warranty work.
Conducted on-site evaluation of existing 20-year-old propane furnace system with air conditioning for replacement estimate. Inspected furnace control board, terminal connections, and wiring configuration to assess current system condition and compatibility requirements for new equipment installation. Documented existing system components including control board circuitry, terminal block connections, and mechanical assembly beneath floor structure to determine proper sizing and specifications for replacement HVAC system.
Responded to no heat call on system displaying yellow triangle error code. Upon arrival, inspected outdoor unit and refrigerant line connections, noting deteriorated insulation on copper refrigerant lines near foundation. Diagnosed faulty control board causing system lockout. Removed and replaced defective circuit board with new OEM component. Verified all electrical connections, tested system operation, and confirmed unit returned to normal heating mode with error code cleared. System restored to full functionality.
Completed installation and setup of full-scale chlorination system for water treatment. System includes white cylindrical treatment tank with dual-port configuration, blue fill line with clearly marked labeling, and associated piping connections. Chemical supply containers positioned adjacent to water heater tank for convenient access and maintenance. All components properly installed, labeled with service information, and operational markings documented for future reference.
Completed cooling maintenance club visit on air handler system. Performed comprehensive inspection of electrical compartment, verifying all wire connections, capacitor integrity, and ICM control module operation. All components tested within normal parameters, system operating efficiently with no deficiencies noted.
Completed cooling maintenance on air handler as part of club membership visit. Verified refrigerant charge using calibrated scale, confirming system operating at proper levels. Inspected condensate drain line and confirmed proper drainage flow through PVC discharge assembly into gravel-filled collection basin.
Completed heating maintenance club visit on air handler system. Performed comprehensive inspection of HVAC unit including temperature diagnostics using calibration probe, verified blower motor operation and capacitor condition, inspected electrical connections and wire terminations throughout system, and examined all internal components for proper operation. All systems found operating within normal parameters with no issues identified during routine maintenance inspection.
Responded to basement flooding caused by suspected pond overflow backing up through drain system. Performed video camera inspection of drain lines to assess for blockages and structural damage. Snaked affected drains to clear any obstructions and restore proper flow in 25-year-old residential plumbing system.
Serviced dual-tank water treatment system consisting of an iron, manganese, and sulfur filtration unit with electronic control valve. Inspected media condition in filter tank and verified system operation, discussing with property owner the recommended media replacement interval of approximately five years for optimal filtration performance.
Performed on-site evaluation of existing oil-fired boiler system for conversion to electric air handler. Assessed current mechanical installation including boiler unit, copper piping distribution, control valves, and electrical infrastructure. Documented existing equipment configuration with multiple pipe connections, brass fittings, and electrical conduit routing to panel box. Evaluated wall-mounted components and system layout to determine requirements for electric heating conversion. Provided estimate for removal of oil boiler system and installation of electric air handler unit.
Completed oil furnace tune-up and partial air conditioning system inspection in preparation for home sale. Due to ambient temperatures below manufacturer-recommended testing conditions (below 60°F), full AC performance evaluation could not be safely conducted; visual inspection and accessible component checks were performed on cooling system. Oil heating system received complete seasonal maintenance including combustion analysis, filter service, and safety control verification.
Completed water treatment system maintenance including iron filter valve rebuild and ozone generator replacement. Disassembled and rebuilt the iron filter control valve assembly, replacing worn internal components and seals, then installed new ozone generator unit. Verified proper operation of both the water softener system and filtration equipment, tested all connections for leaks, and confirmed system functionality upon completion.
Responded to emergency gas leak caused by damaged gas line during cabinet replacement work. Upon arrival, confirmed gas supply was already shut off for safety. Located the compromised gas line section that had been nicked during the cabinet installation process. Capped the damaged gas line using appropriate brass fittings to permanently seal the affected section and eliminate the leak hazard. Inspected surrounding plumbing connections and water heater area for any additional concerns. Completed work to restore safe conditions and allow customer to proceed with cabinet installation project.
# Service Report: Boiler No Heat Complaint Responded to no heat complaint on recently installed boiler that was not resolved during previous service visit. Upon arrival, performed comprehensive electrical diagnostics using multimeter and clamp meter to verify power supply and control circuit functionality. Inspected all electrical connections, wiring terminations, and junction points for proper installation and continuity. Evaluated boiler control board and digital display panel operation, confirming power to unit and proper voltage readings throughout system. Examined copper piping connections and verified proper installation of supply and return lines. Tested boiler ignition sequence, flame sensor operation, and safety controls to identify fault preventing heat delivery. Corrected installation deficiencies and verified all electrical connections were properly secured and terminated per manufacturer specifications. Cycled unit through multiple heating cycles to confirm proper operat
# HVAC Install - Complete System ## Job Description Completed full HVAC system installation following approved project specifications. Installed new 3-ton air conditioning condenser unit (Model A5AC30036A1000AA) in exterior location with proper positioning and leveling verified by precision instruments. Unit was manufactured January 2023 and operates at 208-230 volts meeting all electrical specifications and safety requirements. Equipment was properly secured, labeled with all required technical specification and warning decals clearly visible, and positioned adjacent to building structure with adequate clearance from privacy fencing for optimal airflow and future maintenance access. All installation work performed in accordance with manufacturer guidelines and industry standards, with system ready for startup and commissioning.
Completed 4-hour service call to install transformer on HVAC system with Suntec A2VA-7116 fuel pump. During installation, verified proper connection of stainless steel flexible conduit and confirmed system operating pressure within normal range (below 150 PSI). Performed routine maintenance checks on all components to ensure optimal system functionality.
Successfully replaced pressure tank with appropriate T-fittings and installed eight new 1/4 turn shut-off valves throughout the system. Additionally installed customer-supplied faucet and drop-in sink, ensuring proper connection with new P-trap assembly and verified leak-free operation of all components.
Responded to warranty service call for no heat condition. Inspected plumbing system with focus on backflow preventer assembly and associated copper piping. Examined gas line connections and multiple shut-off valves throughout the system. Verified proper installation of pressure regulator and control valves, ensuring all components were functioning correctly to restore heating operation.